Timeline
- December 2019
Award of the lot in the ANEEL transmission auction (02/2019) - July 2023
Obtaining the Installation Environmental License issued by the State Foundation for Environmental Protection (Fepam) of Rio Grande do Sul - March 2024
Obtaining the Operation License for the Caxias Norte Substation - December 2024
Energization (ANEEL deadline)