The Tibagi Electrical Interconnection is made up of two projects:
- The Rosana Project, which started operating in 2020
- The Três Lagoas project, auctioned in lot 6 of the transmission auction that took place in December 2019
The Tibagi Electrical Interconnection is made up of two projects:
This undertaking consists of 37 kilometers of transmission lines where the largest hydroelectric power plant in the state of Sao Paulo is located. It extends from the Ilha Solteira substation, on the border between the states of matter Grosso do Sul and São Paulo until the Três Irmãos (SP) Substation interconnecting the municipalities of Selvíria (MS), Ilha Solteira (SP), Itapura (SP) and Andradina (SP).